Why do you oppose it in the first place? As far as I can tell, it's in an industrial area far from population centers, and they're not using the illegal & polluting generation that Twitter is. In...
Why do you oppose it in the first place? As far as I can tell, it's in an industrial area far from population centers, and they're not using the illegal & polluting generation that Twitter is. In my opinion this is an ideal development.
I think this is much better than the alternative in which this data center is built in the US. I'm all for more Canadian data sovereignty, we should be building out Canadian compute even if it's...
I think this is much better than the alternative in which this data center is built in the US.
I'm all for more Canadian data sovereignty, we should be building out Canadian compute even if it's with some US dollars.
In my opinion, there is no reasonable opposition to any singular data center if they are far from residential areas and powered responsibly. Obviously exceptions can apply, e.g. at scales that put strain on the grid or vastly increase residential power bills.
The Independent Energy System Operator, which manages the provincial grid, told CBC News it studies all new projects to ensure the grid can handle them, before allowing them to connect. It did not answer specifically whether there is capacity to connect this data centre, although EverWind officials said they've been assured there is capacity, at least for the first phase of the project.
This 420 megawatt project, which is the size of the project when the two buildings are built, would consume roughly one-fifth of the current electricity supply on Nova Scotia Power’s grid. EverWind has been granted a permit to use 20 times more water than it claims its data centre will use. They’ve been granted a 30-year permit to draw 10 million litres of water per day from Landrie Lake, and that’s 110 billion litres in total. [...]
“Certainly the vast majority of the feedback that we’ve gotten has been negative, has been people concerned, people asking questions,” continued Chender. “But even those who are in favour of this project say — universally — that they are in favour of it based on the promises being made by the premier, by the federal government, by this company.”
“And it is important to note that none of those promises exist in legislation or regulation. There is nothing to protect Nova Scotians. And so we are here to ask the premier to come back, to table in the legislature the promises that he’s made, and then we can have an opportunity to have a real debate and decide if this is what Nova Scotians want for their future.”
I mean you can’t hold up development because future regulation may exist that prevents it. That would prevent anything anywhere from ever being built, since future regulation can do anything and...
Because there are no regulations in place right now.
I mean you can’t hold up development because future regulation may exist that prevents it. That would prevent anything anywhere from ever being built, since future regulation can do anything and prevent anything.
Buildings are built with the regulation and code at the time. If the developers did their due diligence, then there’s nothing that can be done. Is what it is.
Respectfully, this is an example of NIMBYism and a reactionary take on data centers. No; developers often build out what they can legally build out while they get official permitting. They would...
Respectfully, this is an example of NIMBYism and a reactionary take on data centers.
They said there will be checks and balances but shouldn't those come before they start building?
No; developers often build out what they can legally build out while they get official permitting. They would have studied and gotten pretty good reason to believe that they will succeed on the permitting before they do so. But waiting for 100% confirmation takes longer and adding that extra time to a project is expensive. They take the risk in laying concrete foundations with high certainty and then work on finishing the permitting in parallel tracks. This is a normal way to work, even as an individual in my own company.
They said data sovereignty but they're leasing it to Anthropic for 20 years?
I didn't see anything about data sovereignty here, but in general the two concepts don't collide. A provider leasing a facility can still help Canada/Nova Scotia with data sovereignty goals if the data resides physically in that data center in Canada.
They said it'll help with power for the region but they're building this BEFORE grid upgrades?
I'd be surprised if your grid was running at capacity. There's likely already excess capacity, but the additional load on the grid comes in phases which gives them time to add capacity if needed. From the article:
The first phase will have a capacity of 95 megawatts and the second, 325 megawatts, for a total of 420 megawatts. Nova Scotia’s current electrical generating capacity is close to 3,000 megawatts.
...
The Independent Energy System Operator, which manages the provincial grid, told CBC News it studies all new projects to ensure the grid can handle them, before allowing them to connect. It did not answer specifically whether there is capacity to connect this data centre, although EverWind officials said they've been assured there is capacity, at least for Phase 1.
Literally nothing of this screams concern to me. No project on Day 1 will have every single answer; the government has a process in place to ensure that the grid operates at or under capacity and I'd be shocked if adding 3% load to your grid knocks it over without this "Independent Energy System Operator" being able to tell.
Further down, you have a different comment with:
in June the provincial Premier promised no data centers.
“This discussion’s so far in the future,” he told reporters following a cabinet meeting in Halifax.
“There wouldn’t be a commitment to a data centre unless we could fully supply the energy without any risk to Nova Scotians. We wouldn’t put Nova Scotians’ grid at risk and we wouldn’t put their health at risk.”
So unless there's a reason to believe that your grid is at capacity, I don't see how this is contradictory.
We already have plenty of examples of data centers NOT built right being a polluting mess with noise and vibration that hurt people.
People were also saying this about cell towers causing headaches.
I'm amazed I have to say this, but: Call your provincial, municipal, or federal legislators. Online forums can easily be ignored when considering public opinion (and probably should be, due to the...
What more can a concerned citizen do?
I'm amazed I have to say this, but: Call your provincial, municipal, or federal legislators. Online forums can easily be ignored when considering public opinion (and probably should be, due to the world-wide portion of the www). For further evidence, see how far the Alberta referendum got with less than 25% of people in the province being in favour, compared to how loudly it was asked for online
Though truth be told, I agree with @tibpoe - worst case, the bubble continues, and this can be used for university or Canadian industry. Alternately, the bubble pops (hooray!), and this can be used for any Canadian business, university, or hosting provider that wants to pander to people like me that want to support sovereign hosting, or businesses that want to move away from American cloud providers. Moreover, Canadian infrastructure (and data sovereignty) going up and generating construction jobs at least feels like a good thing in the face of American (economic) aggression
AI (morally, currently) isn't great. But that's not exclusively what data centers are used for, even if that's how this one will likely justify being built at first
Many data centers in the us, especially in the east coast in states like New Jersey or Pennsylvania have been cancelled due to public pressure. I would do research into how those anti-data center...
Many data centers in the us, especially in the east coast in states like New Jersey or Pennsylvania have been cancelled due to public pressure. I would do research into how those anti-data center campaigns were organized.
Why do you oppose it in the first place? As far as I can tell, it's in an industrial area far from population centers, and they're not using the illegal & polluting generation that Twitter is. In my opinion this is an ideal development.
I think this is much better than the alternative in which this data center is built in the US.
I'm all for more Canadian data sovereignty, we should be building out Canadian compute even if it's with some US dollars.
In my opinion, there is no reasonable opposition to any singular data center if they are far from residential areas and powered responsibly. Obviously exceptions can apply, e.g. at scales that put strain on the grid or vastly increase residential power bills.
CBC, Oct 19
NDP Leader Claudia Chender, Halifax Examiner
I mean you can’t hold up development because future regulation may exist that prevents it. That would prevent anything anywhere from ever being built, since future regulation can do anything and prevent anything.
Buildings are built with the regulation and code at the time. If the developers did their due diligence, then there’s nothing that can be done. Is what it is.
Do Canadians have a legal right over what businesses build?
Yes, consultations for large projects have always been a thing.
Especially ones that will be an active drain on infrastructure.
Respectfully, this is an example of NIMBYism and a reactionary take on data centers.
No; developers often build out what they can legally build out while they get official permitting. They would have studied and gotten pretty good reason to believe that they will succeed on the permitting before they do so. But waiting for 100% confirmation takes longer and adding that extra time to a project is expensive. They take the risk in laying concrete foundations with high certainty and then work on finishing the permitting in parallel tracks. This is a normal way to work, even as an individual in my own company.
I didn't see anything about data sovereignty here, but in general the two concepts don't collide. A provider leasing a facility can still help Canada/Nova Scotia with data sovereignty goals if the data resides physically in that data center in Canada.
I'd be surprised if your grid was running at capacity. There's likely already excess capacity, but the additional load on the grid comes in phases which gives them time to add capacity if needed. From the article:
Literally nothing of this screams concern to me. No project on Day 1 will have every single answer; the government has a process in place to ensure that the grid operates at or under capacity and I'd be shocked if adding 3% load to your grid knocks it over without this "Independent Energy System Operator" being able to tell.
Further down, you have a different comment with:
Which I found to be incorrect. The quote was
So unless there's a reason to believe that your grid is at capacity, I don't see how this is contradictory.
People were also saying this about cell towers causing headaches.
I'm amazed I have to say this, but: Call your provincial, municipal, or federal legislators. Online forums can easily be ignored when considering public opinion (and probably should be, due to the world-wide portion of the www). For further evidence, see how far the Alberta referendum got with less than 25% of people in the province being in favour, compared to how loudly it was asked for online
Though truth be told, I agree with @tibpoe - worst case, the bubble continues, and this can be used for university or Canadian industry. Alternately, the bubble pops (hooray!), and this can be used for any Canadian business, university, or hosting provider that wants to pander to people like me that want to support sovereign hosting, or businesses that want to move away from American cloud providers. Moreover, Canadian infrastructure (and data sovereignty) going up and generating construction jobs at least feels like a good thing in the face of American (economic) aggression
AI (morally, currently) isn't great. But that's not exclusively what data centers are used for, even if that's how this one will likely justify being built at first
Many data centers in the us, especially in the east coast in states like New Jersey or Pennsylvania have been cancelled due to public pressure. I would do research into how those anti-data center campaigns were organized.
Thank you